2024·欧洲杯(官方)押注网站-Formal Platform

#

CASE

Shenzhen North Station of Guangzhou Shenzhen Hong Kong Passenger Dedicated Line

6.(重点)广深港客运专线深圳北站.jpg


       The station building of the project is a super long seamless structure, 345m long and 189m wide. The maximum span of the roof is 81m × 86m, the overhang of the East roof is about 63m, and the maximum height of the truss is 22m. The project has won the Luban Award in 2012, Zhan Tianyou award in 2013, China Construction steel structure Gold Award, Guangdong Construction Engineering Quality Award, Guangdong construction industry new technology application demonstration project, China Railway Engineering Corporation Science and technology first prize, China Railway Science and technology second prize, China Railway High Quality Engineering Award and many other awards.



Recommendation of relevant cases

Contact us

Stock code
600477

Home

Close

XML 地图